UM = FP
None Available.
Construction Cost Factor (CCF)
3,799.86/FP, based upon data provided by USACE Engineering & Support Center,
Huntsville. FAC is composed of multiple category codes. CCF was based upon Army catcodes 17872, and
data contained in a previous version of TC 25-8. At present time, the ranges in this FAC are not in the
current TC 25-8, nor is a layout available.
Sustainment Cost Factor (SCF)
,974.88/FP, based on RS Means data and Source 1 SCFs developed for other FACs (i.e. FAC
8712 Retaining Structure), and using the components listed in the USACE standard drawings. . SCF was
based upon Army catcodes 17872, and data contained in a previous version of TC 25-8. At present time,
the ranges in this FAC are not in the current TC 25-8, nor is a layout available.
Sustainable components for this FAC are:
Missile Firing Position consisting of Concrete Pavement, Rip Rap, and Berms.
No Layout Available