UM = EA
Construction Cost Factor (CCF)
,082.71/EA, based upon analysis of Army category codes cc17950 & cc17994 within this
FAC. MIL-HDBK-1027/3B was used to develop an engineering evaluation which identified the
components of training apparatus that would be constructed and then costed using commercial pricing
guides.
Sustainment Cost Factor (SCF)
9.87/FP, based on the ratio from FAC 7522 (2.31%) as no other auditable sources were
available.