UM = EA
Construction Cost Factor (CCF)
||content||
,064,239.68/EA, based on reported data from the Services for a Fire Fighting Training System,
as currently being installed at numerous locations. Values were inflated to FY04 $ using the appropriate
factors as published by OSD.
Sustainment Cost Factor (SCF)
,497.53/EA, the sustainment factor was calculated using a ratio from FAC 7311 (2.02%) as no
other auditable data was available.