UM = SF
Construction Cost Factor (CCF)
9.60/SF, based on data from TriService, and deflated to FY04 $ using a deflation factor of
0.97.
Sustainment Cost Factor (SCF)
.66/SF, using the Whitestone MARS and a component list derived from the DoD typical
inventory size of 12,815 SF. Values shown are in FY04 $.
Replacement
Cost:
||content||
,384,148
Building GSFT:12,815
M&R Average Annual Cost Forecasts
Current Year
5 Year
20 Year
50 Year
PM & Minor Repair:
,613
,244
,951
,840
Unscheduled
,968
,427
,194
,080
Renewal &
Replacement:
,484
,819
,096
Total M&R Costs:
,581
,154
,965
,016
As % of replacement:
1.20%
1.60%
2.16%
2.46%
Per gsft:
||content||
.29
||content||
.73
.33
.66
Component
Quantity
UM
Component
Quantity
UM
Stucco, Exterior, 1st Floor
7520
Sq Ft
Pipe & Fittings, 6" Cast Iron
0.3
K Ln Ft
Aluminum Operable Window, 12 sf, 1st Floor
3
Each
Pipe & Fittings, 4" DWV PVC
0.2
K Ln Ft
Steel Single 12'x12', Painted, Roll-up Door
1
Each
Roof Drain, 4-6"
4
Each
Steel, Painted, Exterior Door
3
Each
Pipe & Fittings, 4" Steel, Gas
1
K Ln Ft
Built-up Roof
12810
Sq Ft
Chemical Feed System
2
Each
Concrete Block, Painted, Interior Wall Finish
36760
Sq Ft
Circulation Pump 5 HP, Hot Water
2
Each
Concrete, Unfinished Flooring
12690
Sq Ft
Expansion Tank, 30 Gal.
2
Each
Linoleum Flooring
130
Sq Ft
Gas Boiler, 250 Mbh
2
Each
Acoustical Tile, Dropped, Ceiling
130
Sq Ft
Air Handler, Singlezone, 6500 Cfm
2
Each
Metal Unpainted Interior Ceiling
12690
Sq Ft
Air Conditioner, Window, 2 Ton
1
Each
Flush Tank Water Closet
1
Each
Fire Sprinkler Head
1
Each
Lavatory, Vitreous China
1
Each
Distribution Switch, Fused, <600 V
2
Each
Service Sink, Iron Enamel
3
Each
Main Switchgear, <1200 Amp.
1
Each
Pipe & Fittings, 2" Copper, Cold Water
0.65
K Ln Ft
Motor Starter, 5-20 HP, <600 V
6
Each
Pipe & Fittings, 3/4" Copper, Cold Water
0.2
K Ln Ft
Fluorescent Lighting Fixture, 160w
87
Each
Pipe & Fittings, 3/4" Copper, Hot Water
0.15
K Ln Ft
Receptacle, 120V, 15 Amp
124
Each
Pipe Insulation, Cold Water
0.2
K Ln Ft
Wiring Device, Switch
120
Each
Pipe Insulation, Hot Water
0.15
K Ln Ft
Fire Alarm Control Panel
1
Each
Water Heater, Gas/Oil 65 Gph
1
Each
Smoke Detector
91
Each
Pipe & Fittings, 10" Cast Iron
0.5
K Ln Ft
Annual Sustainment Costs
.00
.00
.00
.00
.00
1 3 5 7 9 11 13 15 17 19 21 23 25 27 29 31 33 35 37 39 41 43 45 47 49
50 Year Life Cycle