UM = SF
Construction Cost Factor (CCF)
.72/SF, based on data provided from AFCESA and USACE, and a weighted average of the
Service's reported inventory of the various category codes in this FAC. Values were adjusted to FY04$
using the appropriate inflation/deflation factor.
Sustainment Cost Factor (SCF)
.46/SF, using the Whitestone MARS and a component list derived from the DoD typical
inventory size of 1,377 SF. Values are in FY04 $.
Replacement
Cost:
,758
Building GSFT:1,377
M&R Average Annual Cost Forecasts
Current Year
5 Year
20 Year
50 Year
PM & Minor Repair:
7
||content||
,053
||content||
,033
||content||
,018
Unscheduled
||content||
,050
||content||
,200
||content||
,193
||content||
,175
Renewal &
Replacement:
1
||content||
,702
,569
Total M&R Costs:
||content||
,957
,614
,928
,762
As % of replacement:
1.98%
2.65%
3.98%
4.82%
Per gsft:
||content||
.42
||content||
.90
.85
.46
Component
Quantity
UM
Component
Quantity
UM
Clay Brick, Exterior, 1st Floor
891
Sq Ft
Service Sink, Iron Enamel
1
Each
Clay Brick, Exterior, 2nd Floor
825
Sq Ft
Tankless Water Closet
1
Each
Concrete Block, Exterior, 1st Floor
444
Sq Ft
Urinal, Vitreous China
1
Each
Concrete Block, Exterior, 2nd Floor
444
Sq Ft
Pipe & Fittings, 3/4" Copper, Cold Water
0.2
K Ln Ft
Aluminum Fixed Window, 12 sf, 1st Floor
14
Each
Pipe & Fittings, 3/4" Copper, Hot Water
0.2
K Ln Ft
Aluminum Fixed Window, 12 sf, 2nd Floor
15
Each
Pipe Insulation, Cold Water
0.5
K Ln Ft
Steel w/ Safety Glass, Painted, Exterior Door
1
Each
Pipe Insulation, Hot Water
0.2
K Ln Ft
Steel, Painted, Exterior Door
1
Each
Water Heater, Electric 52 Gal.
1
Each
Asphalt Shingle Roof
1033
Sq Ft
Pipe & Fittings, 6" Cast Iron
0.2
K Ln Ft
Steel, Painted, Interior Door
1
Each
Pipe & Fittings, 4" DWV PVC
0.1
K Ln Ft
Wood, Solid Core, Painted, Interior Door
13
Each
Roof Drain, 4-6"
1
Each
Concrete Interior Steps
5
Sq Ft
1
Each
Metal Interior Railing, Painted
10
Ln Ft
Air Conditioner, Window, 1 Ton
1
Each
Concrete Block, Painted, Interior Wall Finish
1538
Sq Ft
Fire Sprinkler Head
11
Each
Fabric Interior Wall Finish
855
Sq Ft
Circuit Breaker, Main, 600 V, 800 Amp., 3 Ph.
1
Each
Sheetrock, Unstippled, Interior Wall Finish
1400
Sq Ft
Distribution Panel Board
1
Each
Carpet, Nylon 20 oz., Low Traffic
571
Sq Ft
Emergency Lighting Pack, 2 Light w/ Battery
1
Each
Concrete, Finished Flooring
670
Sq Ft
Fluorescent Lighting Fixture, 160w
15
Each
Terrazzo Flooring
93
Sq Ft
Incandescent Lighting Fixture, Basic, 100w
1
Each
Vinyl Tile Flooring
43
Sq Ft
Receptacle, 120V, 15 Amp
35
Each
Acoustical Tile, Dropped, Ceiling
682
Sq Ft
Wiring Device, Switch
20
Each
Metal Unpainted Interior Ceiling
608
Sq Ft
Fire Alarm Bell, 6"
1
Each
Sheetrock, Unstippled, Ceiling
88
Sq Ft
Manual Pull Station
1
Each
Drinking Fountain, Refrigerated
1
Each
Smoke Detector
3
Each
Lavatory, Vitreous China
1
Each
Annual Sustainment Costs
.00
.00
.00
.00
1 3 5 7 9 11 13 15 17 19 21 23 25 27 29 31 33 35 37 39 41 43 45 47 49
50 Year Life Cycle