UM = SY
Construction Cost Factor (CCF)
.54/SY, based on data provided from USACE, deflated to FY04 $ using a deflation factor of
0.985. . Costs are based on a 7/8 asphalt 1/8 concrete split.
Sustainment Cost Factor (SCF)
||content||
.06/SY, the sustainment factor was calculated using data from RS Means.
No Layout Available