UM = LF
Construction Cost Factor (CCF)
,544.73/LF, based on data provided by the Akron Metropolitan Area Transit System, and
inflated to FY04 $ using the appropriate factors as published by OSD.
Sustainment Cost Factor (SCF)
9.56/LF, the sustainment factor was calculated using a ratio from FAC 8601 (1.13%) as no
other auditable data was available.