UM = EA
Construction Cost Factor (CCF)
,338.95/EA, based on data provided by Marshall & Swift, #17/55, and inflated to FY04 $
using the appropriate factors as published by OSD. Costs were based on a 250 TN Railroad track scales.
Sustainment Cost Factor (SCF)
||content||
,077.33/EA, the sustainment factor was calculated using a ratio from FAC 8601 (1.13%) as no
other auditable data was available.