UM = SY
Construction Cost Factor (CCF)
6.20/SY, based on data provided by Marshall & Swift, #66/3, and inflated to FY04 $ using the
appropriate factors as published by OSD.
Sustainment Cost Factor (SCF)
.46/SY, the sustainment factor was calculated using a ratio from FAC 8513 (2.81%) as no
other auditable data was available.