UFC 4-171-05
1 January 2005
with change 25 October 2006
D sample 1391 Continued
2. DATE
1. COMPONENT
FY 2 0 0 2 MILItARY COnstRUCtIOn PROJeCt DAtA
Jul 01
AR
3. INSTALLATION AND LOCATION
Eldridge-Harrington USARC
Conway,AR
5. PROJECT NUMBER
4. PROJECT TITLE
CAR 02-10317
AR Center/OMS/AMSA/Unh Strg
12. SUPPLEMENTAL DATA
12. SUPPLEMENTAL DATA:
a. Estimated design data:
(1) Status:
(a) Date Design Started............................. /
(b) Percent Complete as of
...........
%
(c) Date Design 35% Complete........................ /
(d) Date Design Complete............................ /
(e) Parametric Cost Estimating Used to Develop Cost.
No
(f) An energy study and life cycle cost analysis will
be documented during the final design.
(g) Type of Design Contract..........
(2)
Basis:
(a) Standard or Definitive Design...................
No
(b) Where Design Was Most Recently Used...
N/A
(3)
Total Cost (c) = (a) + (b) or (d) + (e) :
(a) Production of Plans and Specifications..........
0
(b) All Other Design Costs..........................
0
(c) Total...........................................
0
(d) Contract........................................
0
(e) In-house........................................
0
(4)
Construction Award.................................... /
(5)
Construction Start.................................... /
(6)
Construction Completion............................... /
b. Equipment associated with this project which will be provided from
other appropriations:
Fiscal Year
Appropriated or
Equipment
Procuring
Cost
Requested
Nomenclature
Appropriation
Furniture
OMAR
2003
188
Shelving
OMAR
2002
111
Fitness Equipment
OMAR
2003
50
Wire Partitions
OMAR
2002
128
OMAR
2003
1
IT SPT Equipment
OMAR
2003
157
Lockers
OMAR
2002
50
685
Total:
DD
1391c
Page
3
of 3
FORM
1 DEC 76
167