UFC 4-171-05
1 January 2005
with change 25 October 2006
D sample 5034-R Continued
Project Number : 10317
Project Ttle
: AR Center/OMS/AMSA/Unh Strg
Date
: Jun 30, 2005
Functional space Details - Actual/ english
171 - training Building
b. Memorandum, OCAR, DAAR-EN, 27 October 1999, Subject: Information
Technology Requirements n Design and Construction.
IT services provided on-site will include:
Logistics, and other, STAMIS Applications
Within the 1-4 FTUS site, all IT support equipment will be rack-mounted n climate
controlled facilities as IT Support Facilities. Recommended square footage for 1-4
FTUS IT Support Facilities are:
Network Operations Center (NOC) 14.9 SM (160 SF)
Electrical Closet
11.1 SM (120 SF)
TOTAL
26.0 SM (280 SF)
The Electrical Closet here is n addton to the normal authorization n Section H.(8).
Design and construction should comply with Reference a.
IA7
Lobby Area -
LOBBY AREA::
Normal authorization is 44.6 SM (480 SF).
IB1
Assembly Areas -
ASSEMBLY AREA: PROVIDES SPACE FOR TROOP FORMATIONS,
PERSONNEL ASSEMBLIES, FOOD SERVICE AND LARGE GROUP ASSEMBLIES
FOR INSTRUCTIONAL TRAINING.
LOCATE ADJACENT TO THE UNIT SUPPLY, CHAIR AND TABLE STORAGE,
AND CLASSROOM AREAS.
PROVIDE 10' MINIMUM CEILING HEIGHT IN THE ASSEMBLY AREA TO
SUPPORT CLASSROOM TYPE TRAINING AND ASSEMBLY/DINING
REQUIREMENTS OF THE UNITS ASSIGNED TO THE CENTER. THE ASSEMBLY
AREA MAY HAVE A MOVEABLE PARTITION TO SUBDIVIDE THE ROOM INTO
EQUALLY SIZED ASSEMBLY AREAS.
IB2
Chair and Table Storage -
CHAIR & TABLE STORAGE: LOCATE ADJACENT TO THE ASSEMBLY AREA.
ID1
Arms Vault -
VAULT: VAULT SHOULD BE PROVIDED WITH ELECTRICAL AND PLUMBING
FOR A DEHUMIDIFIER. LOCATE ADJACENT TO THE STAGING AREA WITH
ENTRANCE TO THE VAULT THROUGH THE ARMORER AREA.
171