UFC 4-171-05
1 January 2005
with change 25 October 2006
D sample 5034-R Continued
Project Number : 10317
Project Ttle
: AR Center/OMS/AMSA/Unh Strg
Date
: Jun 30, 2005
Functional space Details - Actual/ english
171 - training Building
IE4
Learning Center -
EDUCATIONAL AREAS, LEARNING CENTER:
ALLOWANCE IS BASED ON THE TOTAL AUTHORIZED DRILLING STRENGTH
OF THE LARGEST DRILL WEEKEND.
109 SOLDIERS/50 = 2.18=> 3 x 4.64 SM (50 SF) = 13.9 SM (150 SF)
PROVIDE DUPLEX ELECTRICAL OUTLETS AT FOUR FOOT INTERVALS
ALONG THE WALLS FOR OPERATION OF CARRELS WITH COMPUTER
CONNECTIONS IN THE LEARNING CENTER. USE ONLY SINGLE, NOT
DOUBLE, CARRELS IN THE FURNITURE DESIGN. LOCATE NEAR THE LIBRARY
READING ROOM, LIBRARY STORAGE, AND TRAINING AID STORAGE AREAS.
IE5
Training Aids Storage -
EDUCATIONAL AREAS, TRAINING AIDS STORAGE:
ALLOWANCE IS 10% OF TOTAL CLASSROOM SPACE.
83.6 SM (900 SF) X 10% = 8.4 SM (90 SF)
PROVIDE SHELVING IN THE TRAINING AIDS STORAGE ROOM. LOCATE
ADJACENT TO THE CLASSROOMS.
IE6
COMSEC Training -
COMSEC TRAINING: PROVIDE ONE 9.3 SM (100 SF) AREAS LOCATED
ADJACENT TO THE COMSEC STORAGE FOR THE UNIT AUTHORIZED.
IE7
COMSEC Storage -
COMSEC STORAGE: PROVIDE ONE 9.3 SM (100 SF) AREAS LOCATED
ADJACENT TO THE COMSEC STORAGE FOR THE UNIT AUTHORIZED.
IF1
Unit/Individual Equipment Storage -
UNIT/INDIVIDUAL EQUIPMENT STORAGE:
SUBDIVIDE INTO 2.4-METER BY 3.7-METER (8-FOOT BY 12-FOOT) CAGES
CONSTRUCTED OF WOVEN WELDED WIRE FABRIC. CAGING SHOULD BE
INSTALLED FROM FLOOR TO THE ROOF DECK OR FLOOR SLAB ABOVE. AISLES
AND VESTIBULES BETWEEN THE CAGED AREAS SHOULD BE KEPT TO A
MINIMUM.
18 CAGES @ 8.92 SM (96 SF) = 161 SM (1728 SF)
CIRCULATION @ 15% = 24 SM ( 260 SF)
TOTAL
= 185 SM (1988 SF)
IF2
Stagng Area -
STAGING AREA: Area will be 10% of the total individual storage area authorized.
173