UFC 4-171-05
1 January 2005
with change 25 October 2006
D sample 5034-R Continued
Project Number : 10317
Project Ttle
: AR Center/OMS/AMSA/Unh Strg
Date
: Jun 30, 2005
Functional space Details - Actual/ english
171 - training Building
Stagng area should have an exterior double door and adjacent to the supply office.
IF3
Supply Office -
SUPPLY OFFICE:
One office of 11.15 SM (120 SF) is authorized for the fulltme supply persont. The
office should be located adjacent to the staging area and unt supply storage area.
IF4
Janitorial Storage -
STORAGE AREAS, JANITORIAL STORAGE:
AUTHORIZED ALLOWANCE IS 4.6 SM (50 SF) FOR STORAGE OF JANITORIAL
SUPPLIES AND EQUIPMENT.
IF7
Facility Maintenance/Storage Area -
STORAGE AREAS, FACILITY MAINTENANCE:
THE AUTHORIZED SIZE FOR THE FACILITY MAINTENANCE AREA IS 74.3 SM
(800 SF).
IG10
Physical Readiness Area -
SPECIAL TRAINING AREAS, PHYSICAL READINESS AREA:
ALLOWANCE IS BASED ON THE TOTAL AUTHORIZED DRILLING STRENGTH
OF THE LARGEST DRILL WEEKEND.
107 SOLDIERS/10 = 10.7=> 11 X 9.29 SM (100 SF) = 102.2 SM (1100 SF)
A NEW PHYSICAL READINESS AREA NEAR THE NEW LOCKER ROOM
SHOULD BE CONSTRUCTED. THE EXISTING PHYSICAL READINESS AREA
CANNOT BE EXPANDED DUE TO BUILDING CONFIGURATION AND SHOULD BE
REMODELED AS THE BREAK ROOM AFTER CONSTRUCTION OF THE ADDITION.
IG13
-
Special Training Areas, Famly Support:
References:
a. Memorandum, USARC, DAAR-EN, 14 September 2000, Subject: Interim Change,
AR 140-483, Army Reserve Land and Facilities Management
A famly support office of 200 square feet (18.58 square meters) is authorized for all
centers for use of all units on their respective drill weekends, regardless of unt strength.
IG14
-
Special Training Areas, Weapons Simulator Room:
174