MIL-HDBK-1027/1B
Table 7 (Continued)
19F3 and 19F3B Structures
________________________________________________________________
Notes (Continued):
9.
PKP and CO2 in B2 should come from portable
extinguishers; 9 CO2 charges for PKP bottles required
per class.
10. Each class should use 72 OBA canisters with each
canister being used three times.
11. B3 should have foam provisions similar to B4 so they
can be used interchangeably.
________________________________________________________________
TOTAL UTILITIES
________________________________________________________________
CLASS DAY 2
WEEKLY
MONTHLY
Propane
1 584 800 L
4 754 400 L
69 584 L
Water
265 300 L
795 900 L
3 183 600 L
AFFF Concentrate
5738 L
4548 L
18 192 L
PKP
687 kg
545 kg
2179 kg
CO2
64 kg
191 kg
763 kg
________________________________________________________________
Notes:
1.
The water category includes the water portion of the
AFFF (94 percent water, 6 percent AFFF for design).
2. 70 percent of the water usage for a class occurs on
the first day of class. However, since the
successive classes overlap, the design daily water
consumption equals the values for one 2-day class.
3. The monthly consumption equals four times the weekly
values.
_______________________________________________________________
99