MIL-HDBK-1027/1B
Table 8
19F3 and 19F3B Ventilation Air
________________________________________________________________
MAXIMUM
PROPANE
VENTILATION
BUILDING
BUILDING
DEMAND
AIR OUT AT 315
VENTILATION
COMPARTMENT
L/s
degrees C L/s
AIR OUT L/s
________________________________________________________________
B1
Area
1
79
14 113
63,500
Area
2
88
15 859
B2
Area
1
9
4342
8685
Area
2
9
4342
Area
3
2
1086
B3
186
56 640
56 640
B4
186
56 640
56 640
________________________________________________________________
Note:
Fan static pressure should be determined by bringing
16 degrees C air through the louvers and exhausting
315 degrees C through the exhaust system.
________________________________________________________________
3.14.4
Electrical
a) Provide 120/208 V, three-phase service to each of
the structures as follows:
B1 building
70 kVA
B2 building
37.5 kVA
B3 and B4 building
25 kVA each
b) Provide the following spare conduits from the
instructor's station located at the of building B1 to B2, B3,
and B4 buildings as follows:
B2 Building
3 - 76 mm conduit
B3 Building
3 - 76 mm conduit
B4 Building
3 - 76 mm conduit
100