UFC 4-211-02N
10 January 2005
including change 3, 13 April 2007
Design the paint-finishing hangar to meet the criteria set forth in UFC 4-211-01N,
with the following special requirements:
4-5.1
Provide heating systems in accordance with paragraph 2-4.1.
4-5.2
Provide ventilation systems in accordance with paragraph 2-4.2.
4-5.3
Air Conditioning.
Provide air conditioning systems for administrative areas in accordance with
paragraph 2-4.1.
4-5.4
Plumbing.
Provide plumbing systems in accordance with paragraph 2-4.3. Provide an
industrial waste system if required by facility pollution control procedures for
control of paint stripping residue. Locate storm water drains at least 310 mm (12
in) from the hangar access door rails.
4-5.5
Compressed Air.
Provide compressed air in accordance with paragraph 2-4.4.
4-5.6
Noise and Vibration Control.
Design mechanical systems and equipment to limit noise and vibration in
accordance with UFC 3-450-01.
4-5.7
PMB Reclamation.
Design mechanical system and equipment to reclaim, and recycle the plastic
media...
4-6
ELECTRICAL REQUIREMENTS.
Provide electrical systems, including power, lighting and grounding, in
accordance with paragraph 2-5.
4-6.1
Hazardous Classification.
The focus of the design shall be to maintain the PMB facility as an unclassified
space per the definitions of locations requiring hazardous classification, NFPA
70.
24