UFC 4-211-02N
10 January 2005
including change 3, 13 April 2007
Isolate work-bays and spaces used for paint and chemical mixing with 2-hour
fire-rated walls.
3-4.4
Floors.
Design work-bay floors in accordance with the criteria in UFC 3-260-02. Design
other floors in accordance with UFC 1-200-01.
3-4.5
Ceilings.
Provide administrative and personnel spaces with a noncombustible, suspended
acoustical ceiling.
3-4.6
Doors and Door Controls.
Provide doors and controls in accordance with UFC 4-211-01N.
3-4.7
Building Insulation.
Insulate building walls, roof, and floor in accordance with UFC 4-211-01N.
3-4.8
Surface Treatment.
In addition to the requirements in paragraph 2-3.8, provide walls, inside surfaces
of doors, and ceilings of work-bays with a light-colored, smooth, hard surface.
3-4.9
Exterior Pavement.
Exterior paved areas of the hangar include aircraft and vehicle access and non-
organizational parking. Aircraft pavement should be in accordance with UFC 3-
260-02, and vehicle access and parking should be in accordance with MIL-
HDBK-1190.
3-5
MECHANICAL REQUIREMENTS.
Design the paint-finishing hangar to meet the criteria set forth in UFC 4-211-01N,
with the following special requirements:
3-5.1
Provide heating systems in accordance with paragraph 2-4.1.
3-5.2
Vapors.
Provide ventilation systems in accordance with paragraph 2-4.2.
3-5.3
Air Conditioning.
19