UFC 4-211-02N
10 January 2005
including change 3, 13 April 2007
Provide air conditioning systems for administrative areas in accordance with
paragraph 2-4.1.
3-5.4
Plumbing.
Provide plumbing systems in accordance with paragraph 2-4.3. Provide an
industrial waste system if required by facility pollution control procedures for
control of paint stripping residue. Locate storm water drains at least 310 mm (12
in) from the hangar access door rails.
3-5.5
Compressed Air.
Provide compressed air in accordance with paragraph 2-4.4.
3-5.6
Noise and Vibration Control.
Design mechanical systems and equipment to limit noise and vibration in
accordance with UFC 3-450-01.
3-6
ELECTRICAL REQUIREMENTS.
Provide electrical systems, including power, lighting and grounding, in
accordance with paragraph 2-5.
3-7
FIRE PROTECTION.
Design fire protection systems in accordance with paragraph 1-10.
3-8
ENVIRONMENTAL CONTROLS.
The type of environmental controls required will depend on the pollution
abatement regulations at the site and the type and quantities of paints used.
Environmental controls can be a major construction and operating cost item;
therefore, an accurate determination of regulations and paints (existing and
proposed) is required prior to design.
20