UFC 4-721-11.1
26 Nov 01
c. Closeout Plan. Evaluators shall review and evaluate the Offeror's proposed closeout plan. Particular
emphasis shall be placed on the preparation of Operations & Maintenance Manuals and the training of the
base personnel on the installed systems and materials.
Other Considerations: None.
/__ / Excellent
/__ / Above Average
||content||
\ /1/ /__ / Average
||content||
\ /1/ /__ / Poor
/__ / Unacceptable
Proposal Strengths. Include narrative comments with respect to proposal strengths in the Offeror's
proposed Closeout Plan. Comments are required for all ratings above "AVERAGE".
Proposal Weaknesses. Include narrative comments with respect to proposal weaknesses of the
Offeror's proposed Closeout Plan. Comments are required for all ratings above "AVERAGE".
Appendix B Page 46