UFC 4-721-11.1
26 Nov 01
PROPOSAL RATING WORKSHEET
FACTOR 2-6
OFFEROR MANAGEMENT PLANS AND SCHEDULES
Offeror: ________________________________________
Evaluator:_______________________________________
1. General: This factor is equal in importance to Factor 2-5. The information provided in response to this
factor completes the Offeror Performance Information which was received, reviewed, and evaluated in Phase
1 of this solicitation. Through this factor the evaluators will review and evaluate the Offeror's demonstrated
understanding of the design/build process as required in this solicitation. Each of the four subfactors are
approximately equal in importance.
2. Subfactor Evaluations.
a. Quality Control Plan. Evaluators shall review and evaluate the Offeror's quality control procedures
planned for application to this project. The quality control plan and procedures must address design as well
as construction phases of the project. The proposed quality control program must include and address the
Corps three phase quality control system and acknowledge experience and familiarity with the Corps Quality
Assurance program. If personnel identified by the Offeror have changed, the alternate personnel shall be
reviewed to assure a similar level of quality.
Other Considerations: None.
/__ / Excellent
/__ / Above Average
||content||
\ /1/ /__ / Average
||content||
\ /1/ /__ / Poor
/__ / Unacceptable
Proposal Strengths. Include narrative comments with respect to proposal strengths in the Offeror's
Quality Control Program. Comments are required for all ratings above "AVERAGE".
Appendix B Page 44