UFC 4-721-11.1
26 Nov 01
e. Sanitary Sewer System. This subfactor is considered the most important subfactor due to the desire to
maintain a gravity sanitary sewer system. Consideration shall be given to the placement of sanitary sewer
mains, provisions for cleaning, and to the inclusion of a pumping station/force main if required by the site
development. Included in this subfactor is the evaluation of actual materials proposed for installation.
Other Considerations: None.
/__ / Excellent
/__ / Above Average
||content||
\ /1/ /__ / Average
||content||
\ /1/ /__ / Poor
/__ / Unacceptable
Proposal Strengths. Include narrative comments with respect to proposal strengths in the area of
Sanitary Sewer System design. Comments are required for all ratings above "AVERAGE".
Proposal Weaknesses. Include narrative comments with respect to proposal weaknesses in the area
of Sanitary Sewer design. Comments are required for all ratings above "AVERAGE".
Other Comments. Include any other comments with respect to Sanitary Sewer design here.
Appendix B Page 39