1. General: This factor is significantly less important factor in the technical analysis of the proposed
solution offered by the Offeror than Factor 2-3. In analyzing the various subfactors the evaluators must rate
these items with respect to material quality, durability, life cycle cost considerations, and on-going
maintenance required. Proposals which exceed the minimum requirements of the solicitation in these
areas should be rated above "AVERAGE". Particular attention should be paid to the development of
livable communities for the soldiers and to the inclusion of Force Protection considerations.
Subfactor a.
This is the most important subfactor, equal to subfactor b, and c.
Subfactor b.
This is the most important subfactor, equal to subfactor a, and c.
Subfactor c.
This is the most important subfactor, equal to subfactor b, and a.
Subfactor d.
This subfactor is less important than sufactor a.
Subfactor e.
This subfactor is less important than sufactor a.
Subfactor f.
This subfactor is less important than sufactor a.
Subfactor g.
This subfactor is less important than sufactor a.