UFC 4-721-11.1
26 Nov 01
d. Grading. This subfactor considers the amount and type of grading required by the proposed site design.
Also included are considerations for storm drainage, retention ponds, cut and fill, and erosion control.
Materials proposed for storm drainage systems are evaluated elsewhere.
Other Considerations: Placement of parking areas, placement of pedestrian parkways, drainage structures
/__ / Excellent
/__ / Above Average
||content||
\ /1/ /__ / Average
||content||
\ /1/ /__ / Poor /__ / Unacceptable
Proposal Strengths. Include narrative comments with respect to proposal strengths in the area of site
Grading. Comments are required for all ratings above "AVERAGE".
Proposal Weaknesses. Include narrative comments with respect to proposal weaknesses in the area
of site Grading. Comments are required for all ratings above "AVERAGE".
Other Comments. Include any other comments with respect to site Grading here.
Appendix B Page 29