UFC 4-721-11.1
26 Nov 01
Proposal Weaknesses. Include narrative comments with respect to proposal weaknesses of the
Offeror's Quality Control Program. Comments are required for all ratings above "AVERAGE".
b. Schedule Information. Evaluators shall review and evaluate the Offeror's proposed schedule information
to determine the extent of "fast tracking" included. The schedule must reflect a single task oriented structure
for both design and construction operations. Evaluators shall review and assess completeness, inclusion of
required milestones, and realism. Proposed schedules which indicate project completion prior to the
Government indicated maximum duration may receive favorable consideration.
Other Considerations: None.
/__ / Excellent
/__ / Above Average
||content||
\ /1/ /__ / Average
||content||
\ /1/ /__ / Poor
/__ / Unacceptable
Proposal Strengths. Include narrative comments with respect to proposal strengths in the Offeror's
proposed Project Schedule. Comments are required for all ratings above "AVERAGE".
Proposal Weaknesses. Include narrative comments with respect to proposal weaknesses of the
Offeror's proposed Project Schedule. Comments are required for all ratings above "AVERAGE".
Appendix B Page 45