UFC 4-730-01
7 April 2006
including change 1, 20 June 2006
Exceptions may be made for other buildings that are in excellent condition, subject to
the location determinants in paragraph 2-4.
Consider adaptability to the intent of the building program. For instance,
can the building/site accommodate the vehicular access desired for the Lending
Locker? Will the building be able to service a need during an emergency crisis
response time? Does the existing building allow for easy access by non-active duty
personnel or family members?
Whether planning a conversion, alteration, addition, or new construction,
barrier-free design requirements and antiterrorism requirements must be taken into
account (see paragraphs 3-7 and 3-8).
2-7.2
Regulatory Authorities. Refer to the following for the appropriate
Service-specific authorities:
Army. U.S. Army Technical Instruction (TI) 800-1, and Army Regulation
(AR) 608-1.
Navy and Marine Corps. Authorities are contained in OPNAVINST
11010.20F and NAVFACINST 11010.45. When planning alterations to an
existing facility to convert it to an FSC, for Navy, consult with Fleet and
Family Support Branch (PERS 660), and for Marine Corps, consult with
HQ USMC, Manpower and Reserve Affairs, Code MR.
Air Force. HQ AFCEE for architectural, landscape, interior design, and
publication coordination; HQ Air Force Civil Engineering Support Agency
(AFCESA) for technical issues relating to fire, life safety, and certification;
Air Force Family Matters (AFFAM/DPPFF) for functional requirements and
policies.
2-8