1-5
RESPONSIBILITIES.
1 - 5 . 1 The using service for individual MCA projects is defined in
A R 415-10, General Provisions for Military Construction, and its
r e s p o n s i b i I i t i e s are outlined in AR 415-20, Project Development and
D e s i g n Approval.
The using service is responsible for:
a.
Establishment of specific project functional requirements
w i t h i n the parameters set down in this guide.
b.
falling
outside
t h e parameters of this guide.
c.
Obtaining installation action to gain site approval if the
p r o j e c t is not sited in accordance with DA approved master
plan.
d.
Preparation and submission of DD Form 1391 and supporting
data in accordance with AR 415-15, MCA Program Development.
e.
P r e p a r a t i o n and submission of
project
requirements
in
the
form required by AR 415-20.
f.
R e v i e w and approval of concept design drawings
to
certify
c o m p l i a n c e with functional requirements.
1-5.2 The Corps of Engineers field office responsible for design will:
a.
Insure that the
functional requirements
of
the
using
service
a r e incorporated
into the design.
b.
Insure that the requirements of the using service meet the
criteria contained herein.
c.
Insure that the quality standards for overall design are
a d h e r e d to in accordance with the policy stated herein.
Insure that the assemblage of user information is complete,
d.
a n d is provided, t o g e t h e r with the completion records
r e q u i r e d by AR 415-10, to the using service.
1-6