UM = FP
Characteristics:
Number of firing positions 4 lanes.
Firing line width 80 meters (20 meters per lane).
Target area width 600 meters wide at the 1000 meters distance.
Firing point configuration numbered markers on slightly elevated, sodded ground; sandbags for rifle support.
Target configuration E-type and F-type silhouettes modified in accordance with TC 23-14, using elevating mechanisms arranged as
shown in illustration; moving targets installed parallel to firing line or at 45 to firing line as indicated.
References FM 23-10, CEHNC 1110-1-23. Targetry is arranged as described in FM 23-10.
Construction Cost Factor (CCF)
6,872.22/FP, based upon data provided by USACE Engineering & Support Center,
Huntsville. FAC is composed of multiple category codes. CCF was based upon Army catcodes 17811 and
17812. Per the Army's inventory, catcode 17811 represents 95% of the total and cc17812 represents 5% of
the total. Values for individual ranges at the category code level were developed and weighted in
accordance with the above percentages.
Sustainment Cost Factor (SCF)
||content||
,693.63/FP, based on RS Means data and Source 1 SCFs developed for other FACs (i.e. FAC
8712 Retaining Structure), and using the components listed in the USACE standard drawings. SCF was
based upon Army catcodes 17811 and 17812. Per the Army's inventory, catcode 17811 represents 95% of
the total and cc17812 represents 5% of the total. Values for individual ranges at the category code level
were developed and weighted in accordance with the above percentages.
Sustainable components for this FAC are:
SIT Emplacement
Berms
MIT Emplacement
Pole w/Floodlight
Foxhole
Data Cable
Power Cable
Circuit Breaker
Cable Junction Box
cc17812