UM = GA
Construction Cost Factor (CCF)
||content||
.70/GA, based on data provided by USACE. A weighted value for all types and sizes of tanks
listed in the USACE pricing guide was done to derived the listed factor. Values were deflated to FY04 $
using a deflation factor of 0.985.
Sustainment Cost Factor (SCF)
||content||
.08/GA, the sustainment factor was calculated using from RS
Means.
No Layout Available