Project Name
Project Number
TEMF
Statement of Work
UFC 4-214-02, 24 Jul 03
3-9.4
Sentry Booth. A Sentry Booth is [not] required. [This OPTIONAL booth must be a
separate line item on the DD Form 1391 to be authorized for inclusion in the project. The booth
must comply with all Force Protection requirements as well as comply with the Installation Design
Guide.] [Provide Sentry Booth with an area of [ _____ m2] . Design of the sentry booth shall allow
full control of all access to and from the facilities. Booth shall include power, lighting, heating,
[cooling] and telephone service suitable for it's intended purpose. ]
3-10
SITE STORAGE. Areas of the hardstand will be designated as storage areas for
various use categories. Where possible, locate storage areas to maintain unit cohesion.
3-10.1
Petroleum, Oil, and Lubricants (POL) Storage Building Area. Provide a
building for
the storage of oil, lubricants, and flammable solvents for daily use at the rate of 5.5 m2 for each 25
vehicles maintained. [Include number of vehicles maintained, or provide a building area
requirement.] [Provide a minimum of 11 m2.] Provide an access apron at the entry of this building
7000 mm by 8000 mm. Maintain 15 300 mm from other site structures to avoid the need for
sprinkling this facility.
3-10.2
Deployment Equipment Storage Building Area. Deployment Equipment Storage
[Category Code 442-24] is [not ] required.[This area is a separate line item, independent of building
and pavement areas. It should be programmed as an integral part of the maintenance facility.
Provide for storage of deployment equipment at the rate of 65 m2 for each company sized unit and
battalion headquarters.] [Provide Deployment Equipment Storage Building with an area of [ m2].
Provide an access apron 8000 mm wide along one side of this building.]
3-10.3
Secured Open Storage Area. Provide hardstand secured open storage area at the
rate of 30 m2 for the first repair bay and 10 m2 for each additional repair bay.
3-10.4
Open Storage Area. Provide a hardstand area of [ m2]. [This hardstand area is
provided at the rate of 20% of the warehouse allocation for DS, GS, DOL, and DPW organizations].
3-10.5
Hazardous Waste Storage Area. This hardstand area is to be provided for the short
term storage of waste fuels, spent solvents, cleaning compounds, and similar hazardous waste.
Provide hardstand and access apron in the same quantity as POL Storage Building above.
3-11
SIDEWALK PLANNING AND DESIGN. Walks from POV parking areas or approaches
to the facility complex shall be a minimum of 1.2m wide exclusive of curb width, and made [non-
reinforced][wire mesh reinforced] concrete with a minimum thickness of 100 mm. Ramps for
handicapped individuals shall be provided at intersections by depressing street curbs and adjacent
sidewalk. Where areas are specifically planned for pedestrian access and circulation, they shall be
so marked within the compound.
3-12
LANDSCAPE PLANTING PLAN. [Insert the requirements of the activity department in
charge of landscaping criteria]. Landscaping shall be in accordance with [Insert activity criteria
governing landscaping]. [A plant list of allowable plants has been attached for the contractor's use].
The offeror shall obtain and use the services of a qualified [State certified] landscape architect,
experienced in site planning and planting design. [The contractor shall provide a complete,
integrated landscape planting plan for the project.] [Delete requirement for landscape planting plan
if planting scope is minor]. Choose plant materials on the basis of plant hardiness, climate, soil
conditions, low maintenance, and quality. Selected plant materials shall be easily maintained and
tolerant of the specific site conditions. Incorporate sustainable design principles into the selection
of plants. Planting or seeding shall occur only during periods when beneficial results can be
SOW-42