Project Name
Project Number
TEMF
Statement of Work
UFC 4-214-02, 24 Jul 03
8-5.5
Compressed air. Piping shall be steel piping conforming to ASTM A 53/A 53M,
Grade B, black steel, schedule 40 or copper tubing conforming to ASTM B 88, ASTM B 88M,
Type K or L. fittings shall conform to ANSI B16.3 or ANSI B16.9 for steel and ANSI B16.22 for
copper.
8-6
MISCELLANEOUS ITEMS.
8-6.1
Cleanouts. Cleanouts shall be provided at each change in direction of sanitary sewer
lines, at the intervals specified in the International Plumbing Code, and at the building service
entrance. All cleanouts shall be permanently accessible. Ground cleanouts shall be installed in
a 305 mm by 305 mm concrete pad, flush with grade. Wall and floor types shall be provided as
required by the code. Provide access panels or cover plates in exposed areas.
8-6.2
Hose bibbs. Hose bibbs shall be provided at minimum 50 m intervals along the
perimeter each main building. Hose bibbs shall be frost proof, and shall be supplied with an
integral vacuum breaker. Provide as required by the code.
8-6.3
Wall hydrants. Provide every 45 m along the perimeter of the building.
8-6.4
Backflow preventers. Provide as required by the code.
8-7
PIPE INSULATION. Insulation type shall be cellular glass (CG) ASTM C 552
Type II and Type III, polyisocyanurate (PC) ASTM C 591 Type I, or phenolic foam (PF)
ASTM C 1126 Type III or flexible cellular insulation, ASTM C 534, Type I and II.
8-7.1
Domestic service hot water piping. Minimum pipe insulation performance shall be in
accordance with the requirements of the latest edition of ASHRAE/IESNA 90.1.
8-7.2
Domestic service cold water piping shall be insulated with a minimum of 13-mm
insulation with vapor jacket.
8-7.3
Roof drain piping. Provide 25-mm thickness insulation on all horizontal piping.
SOW-79