startup and testing of each item of equipment. A certified report shall be provided for each item
of equipment tested.
10-16
COMMISSIONING.
All HVAC
systems and equipment including controls shall be
commissioned in accordance with ASHRAE Guideline 1.
10-17
TRAINING. The Contractor shall conduct a training course for the operating for all
HVAC operating systems and individual items of equipment. The field instructions shall cover
all of the items of equipment provided as well as the overall systems. The training period shall
consist of a total of [8] [16] [__] hours of normal working time and shall start after the systems
are functionally completed and testing,adjusting and balancing have been completed. Factory
representatives shall be present to assist in training for every item of operating equipment
provided. Contractor shall provide two copies of operation and maintenance instructions for
each item of equipment provided. Training shall consist of startup, normal operation and
shutdown, as well as demonstrations of routine maintenance operations. The Contracting
Officer shall be notified at least 14 days prior to date of proposed conduction of the training
course.