Project Name
Project No. ___________
UFC 4-721-11.1, UEPH Complexes, 26 Nov 01
LIST
OF ATTACHMENTS TO THE STATEMENT OF WORK
NUMBER DESCRIPTION
1.
TECHNICAL SPECIFICATIONS
Section 01012 -
Design After Award (Design/Build)
||content||
\ /1/
2.
RESERVED
3.
RESERVED
4.
||content||
\ RESERVED /1/
5.
PROPOSAL DRAWING FORMAT
6.
SITE AND LOCALITY MAPS
7.
PROJECT AND SAFETY SIGNS
8.
GEOTECHNICAL REPORT
9.
EXCERPTS FROM THE INSTALLATION DESIGN GUIDE
10.
FIRE FLOW DATA
11.
LIST OF DRAWINGS
12.
ASBESTOS AND LEAD PAINT SURVEY RESULTS
i