UFC 3-600-02
1 January 2001
Table 2-17. Halon Systems ITM Tasks (Continued)
Component
Tasks
Annual
6. Auxiliary Equipment
(Continued)
(equipment shutdown, dampers,
door closures) operate properly
and are activated by the system
actuation.
7. Valves
1. Verify valves in proper alignment.
5 Years
1. Cylinders
1. Complete external inspection of
non-discharged cylinders to
ensure suitability for use.
2. Flexible Hoses
1. Pressure test hoses to ensure
suitability for use.
2 Years
1. Protected Enclosure
1. Inspect the enclosure to verify
(Room)
integrity and ability to maintain
(and after
agent concentration.
modifications to
compartment)
As Part of
Entire System
1. Visually Check:
Building
a. Pipe hangers.
Inspection
b. Heads for obstruction.
c. Piping for leaks.
d. Riser condition.
2. Ensure:
b. Panels secured and indicator
lamps functional.
c. Notification appliances in place.
d. Manual stations in place and
unobstructed.
e. Nozzles' covers in place.
2-23