Construction Cost Factor (CCF)
0,085.51/FP, based upon analysis of Army category code 17845, which is similar in nature to
the category codes in this FAC. At present time, the ranges in this FAC are not in the current TC 25-8, nor
is a layout available. FAC is composed of multiple category codes.
Sustainment Cost Factor (SCF)
,344.21/FP, based on RS Means data and Source 1 SCFs developed for other FACs (i.e. FAC
8712 Retaining Structure), and using the components listed in the USACE standard drawings. SCF was
based upon Army catcode 17845.
Sustainable components for this FAC are:
SAT Emplacement
Berms
Pole w/Floodlight
No layout available.