UM = FP
None available.
Construction Cost Factor (CCF)
,632.25/FP, based upon analysis of Army category code 17851 and 17854 in a previous version
of TC25-8. An engineering evaluation was made to identify components of real property that would be
constructed and then costed using commercial pricing guides.
Sustainment Cost Factor (SCF)
.29/FP, based on a ratio of CCF to SCF from FAC 1765.
Sustainable components for this FAC are:
N/A
No layout available.