Construction Cost Factor (CCF)
, 318.72/FP, based upon analysis of Army category code 17861 and 17862 in a previous
version of TC25-8. An engineering evaluation was made to identify components of real property that
would be constructed and then costed using commercial pricing guides. Per the Army's inventory, catcode
17861 represents 79% of the total and cc17862 represents 21% of the total. Values for individual ranges at
the category code level were developed and weighted in accordance with the above percentages.
Sustainment Cost Factor (SCF)
8.73/FP, based on a ratio of CCF to SCF from FAC 1761. Per the Army's inventory, catcode
17861 represents 79% of the total and cc17862 represents 21% of the total. Values for individual ranges at
the category code level were developed and weighted in accordance with the above percentages.