UM = FP
Number of firing positions - 15 points.
Firing line width - 140 meters (10 meters/position).
Target area width - 1000 meters wide at the 3500 meters distance.
Firing point configuration hull-down firing position, turret-down firing position. Defilade position should be adjusted to site conditions.
Target configuration - Four MATs on diagonal tracks are located between 300 and 3000 meters.
References - FM 17-12, FM 23-1, CEHNC 1110-1-23.
Construction Cost Factor (CCF)
,187,368.00/FP, based upon data provided by USACE Engineering & Support Center,
Huntsville. FAC is composed of a single Army category code. CCF was based upon Army catcodes
17863.
Sustainment Cost Factor (SCF)
,790.10/FP, based on RS Means data and Source 1 SCFs developed for other FACs (i.e. FAC
8712 Retaining Structure), and using the components listed in the USACE standard drawings. SCF was
based upon Army catcodes 17863.
Sustainable components for this FAC are:
SIT Emplacement
Berms
SAT Emplacement
MAT Emplacement
MAT Railroad
MAT Shed
Data Cable
Power Center Emplacement
Power Cable
Circuit Breaker
Cable Junction Box
Pole w/Floodlight
cc17863