UM = SF
Construction Cost Factor (CCF)
7.60/SF, based on data provided by USACE, and deflated to FY04 $ using deflation factor of
0.985.
Sustainment Cost Factor (SCF)
.46/SF, using the Whitestone MARS and a component list derived from the DoD typical
inventory size of 5,620 SF. Values shown are in FY04 $.
Replacement
Cost:
5,712
Building GSFT: 5,620
M&R Average Annual Cost Forecasts
Current Year
5 Year
20 Year
50 Year
PM & Minor Repair:
,683
,245
,189
,131
Unscheduled
,293
,901
,904
,840
Renewal &
Replacement:
||content||
,838
,227
,474
Total M&R Costs:
,976
,984
,319
,444
As % of replacement:
0.79%
1.13%
1.73%
2.19%
Per gsft:
||content||
.24
||content||
.78
.73
.46
Component
Quantity
UM
Component
Quantity
UM
Clay Brick, Exterior, 1st Floor
4403
Sq Ft
Pipe & Fittings, 2" Copper, Cold Water
0.9
K Ln Ft
Aluminum Fixed Window, 12 sf, 1st Floor
25
Each
Pipe & Fittings, 3/4" Copper, Cold Water
0.7
K Ln Ft
Steel Frame, Painted, Operable Window, 12 sf, 2nd Floor
117
Each
Pipe & Fittings, 3/4" Copper, Hot Water
0.4
K Ln Ft
Steel Single 12'x12', Painted, Roll-up Door
1
Each
Pipe Insulation, Cold Water
0.7
K Ln Ft
Steel, Painted, Exterior Door
2
Each
Pipe Insulation, Hot Water
0.4
K Ln Ft
Built-up Roof
5620
Sq Ft
Water Heater, Electric 52 Gal.
1
Each
Steel, Painted, Interior Door
2
Each
Pipe & Fittings, 10" Cast Iron
0.2
K Ln Ft
Wood, Solid Core, Painted, Interior Door
4
Each
Pipe & Fittings, 6" Cast Iron
0.4
K Ln Ft
Concrete Block, Painted, Interior Wall Finish
4453
Sq Ft
Pipe & Fittings, 4" DWV PVC
0.2
K Ln Ft
Sheetrock, Unstippled, Interior Wall Finish
1153
Sq Ft
Roof Drain, 4-6"
2
Each
Carpet, Nylon 20 oz., Low Traffic
500
Sq Ft
Variable Air Volume Box
4
Each
Concrete, Finished Flooring
4902
Sq Ft
Air Conditioner, Rooftop, 20 Ton
1
Each
Vinyl Tile Flooring
219
Sq Ft
Fire Sprinkler Head
33
Each
Acoustical Tile, Dropped, Ceiling
718
Sq Ft
Distribution Switch, Fused, <600 V
1
Each
Metal Ceiling, Painted
4902
Sq Ft
Main Switchgear, <1200 Amp.
1
Each
Sheetrock, Unstippled, Ceiling
375
Sq Ft
Fluorescent Lighting Fixture, 160w
75
Each
Drinking Fountain, Refrigerated
2
Each
Receptacle, 120V, 15 Amp
85
Each
Emergency Eye Wash
1
Each
Wiring Device, Switch
21
Each
Emergency Shower Station
1
Each
Fire Alarm Bell, 6"
4
Each
Lavatory, Vitreous China
10
Each
Fire Alarm Control Panel
1
Each
Service Sink, Iron Enamel
1
Each
Manual Pull Station
2
Each
Tankless Water Closet
6
Each
Smoke Detector
20
Each
Urinal, Vitreous China
2
Each
Crane, Electric Bridge, <5 Ton
1
Each
Circulator Pump, 1/12 HP, Hot Water
1
Each
Annual Sustainment Costs
.00
.00
.00
.00
1 3 5 7 9 11 13 15 17 19 21 23 25 27 29 31 33 35 37 39 41 43 45 47 49
50 Year Life Cycle