UM = SF
Construction Cost Factor (CCF)
7.64/SF, based on data provided by USACE, and deflated to FY04 $ using deflation factor of
0.985.
Sustainment Cost Factor (SCF)
.84/SF, using the Whitestone MARS and a component list derived from the DoD typical
inventory size of 3,102 SF. Values shown are in FY04 $.
Replacement
Cost:
,722,439
Building GSFT: 3,102
M&R Average Annual Cost Forecasts
Current Year
5 Year
20 Year
50 Year
PM & Minor Repair:
,862
,668
,592
,547
Unscheduled
,649
,362
,303
,257
Renewal &
Replacement:
||content||
,235
,560
,819
,618
Total M&R Costs:
,746
,590
,714
,422
As % of replacement:
0.51%
0.61%
0.80%
1.00%
Per gsft:
.44
.35
.00
.84
Component
Quantity
UM
Component
Quantity
UM
Clay Brick, Exterior, 1st Floor
3271
Sq Ft
Pipe & Fittings, 3/4" Copper, Hot Water
0.6
K Ln Ft
Aluminum Fixed Window, 12 sf, 1st Floor
19
Each
Pipe Insulation, Cold Water
1.2
K Ln Ft
Steel Frame, Painted, Operable Window, 12 sf, 2nd Floor
87
Each
Pipe Insulation, Hot Water
1.2
K Ln Ft
Steel Single 12'x12', Painted, Roll-up Door
1
Each
Water Heater, Electric 52 Gal.
1
Each
Steel, Painted, Exterior Door
2
Each
Pipe & Fittings, 10" Cast Iron
0.2
K Ln Ft
Built-up Roof
3102
Sq Ft
Pipe & Fittings, 6" Cast Iron
0.6
K Ln Ft
Steel, Painted, Interior Door
2
Each
Pipe & Fittings, 4" DWV PVC
0.2
K Ln Ft
Wood, Solid Core, Painted, Interior Door
3
Each
Roof Drain, 4-6"
2
Each
Concrete Block, Painted, Interior Wall Finish
3308
Sq Ft
Exhaust Fan, Roof Mounted, 5000 Cfm
2
Each
Sheetrock, Unstippled, Interior Wall Finish
857
Sq Ft
Variable Air Volume Box
4
Each
Carpet, Nylon 20 oz., Low Traffic
276
Sq Ft
Air Conditioner, Rooftop, 20 Ton
1
Each
Concrete, Finished Flooring
2706
Sq Ft
Direct Digital Controls, System Points
1
Each
Vinyl Tile Flooring
121
Sq Ft
Fire Sprinkler Head
36
Each
Acoustical Tile, Dropped, Ceiling
396
Sq Ft
Fire Suppression System Water Pump
2
Each
Metal Ceiling, Painted
2706
Sq Ft
Distribution Panel Board
3
Each
Sheetrock, Unstippled, Ceiling
207
Sq Ft
Distribution Switch, Fused, <600 V
1
Each
Platform Lifter, 5 Ton
1
Each
Motor Starter, 5-20 HP, <600 V
6
Each
Conveyor System
1
Each
Emergency Lighting Pack, 2 Light w/ Battery
12
Each
Dock Ramp Leveler
1
Each
Fluorescent Lighting Fixture, 160w
41
Each
Drinking Fountain, Refrigerated
2
Each
Receptacle, 120V, 15 Amp
63
Each
Emergency Eye Wash
1
Each
Wiring Device, Switch
16
Each
Emergency Shower Station
1
Each
Fire Alarm Bell, 6"
3
Each
Lavatory, Vitreous China
8
Each
Fire Alarm Control Panel
1
Each
Service Sink, Iron Enamel
1
Each
Manual Pull Station
4
Each
Tankless Water Closet
4
Each
Security/Intrusion Alarm System
1
Each
Urinal, Vitreous China
2
Each
Smoke Detector
11
Each
Circulator Pump, 1/12 HP, Hot Water
2
Each
Dust Collection System
2
Each
K Ln
Pipe & Fittings, 2" Copper, Cold Water
1.4
Ft
Crane, Electric Bridge, <5 Ton
2
Each
K Ln
Pipe & Fittings, 3/4" Copper, Cold Water
1.2
Ft
Annual Sustainment Costs
.00
.00
.00
.00
.00
.00
1 3 5 7 9 11 13 15 17 19 21 23 25 27 29 31 33 35 37 39 41 43 45 47 49
50 Year Life Cycle