UM = SF
Construction Cost Factor (CCF)
1.00/SF, based on data from TriService #14, and deflated to FY04 $ using a deflation factor of
0.97.
Sustainment Cost Factor (SCF)
.34/SF, using the Whitestone MARS and a component list derived from the DoD typical
inventory size of 7,130 SF. Values shown are in FY04 $.
Replacement
Cost:
||content||
,671,486
Building GSFT: 7,130
M&R Average Annual Cost Forecasts
Current Year
5 Year
20 Year
50 Year
PM & Minor Repair:
,134
,156
,730
,709
Unscheduled
,976
,757
,413
,377
Renewal &
Replacement:
3
,820
,986
Total M&R Costs:
,110
,295
,964
,073
As % of replacement:
0.72%
0.85%
1.55%
2.27%
Per gsft:
||content||
.70
.01
.64
.34
Component
Quantity
UM
Component
Quantity
UM
Concrete Block, Exterior, 1st Floor
5510
Sq Ft
Water Heater, Gas/Oil 75 Gph
2
Each
Stairs, Exterior and Decking
250
Sq Ft
Water Storage Tank, 250 Gal.
1
Each
Aluminum Operable Window, 24 sf, 1st Floor
2
Each
Pipe & Fittings, 6" Cast Iron
0.3
K Ln Ft
Steel Frame, Painted, Operable Window, 12 sf, 1st Floor
15
Each
Pipe & Fittings, 4" DWV PVC
0.3
K Ln Ft
Aluminum Frame, Fully Glazed, Exterior Door
2
Each
Roof Drain, 4-6"
2
Each
Steel, Painted, Exterior Door
8
Each
Exhaust Fan, Roof Mounted, 10,000 Cfm
3
Each
Metal Roof
9220
Sq Ft
Variable Air Volume Box
4
Each
Steel, Painted, Interior Door
8
Each
Air Conditioner, Rooftop, 20 Ton
2
Each
Ceramic Tile Wall Finish
3940
Sq Ft
Direct Digital Controls, System Points
1
Each
Fabric Interior Wall Finish
1600
Sq Ft
Fire Sprinkler Head
58
Each
Sheetrock, Unstippled, Interior Wall Finish
2730
Sq Ft
Distribution Panel Board
1
Each
Carpet, Nylon 20 oz., High Traffic
1214
Sq Ft
Main Switchgear, >1200 Amp.
1
Each
Concrete, Finished Flooring
303
Sq Ft
Motor Starter, 5-20 HP, <600 V
6
Each
Quarry Tile Flooring
4546
Sq Ft
1
Each
Acoustical Tile Ceiling
6060
Sq Ft
Emergency Lighting Pack, 2 Light w/ Battery
4
Each
Drinking Fountain, Refrigerated
1
Each
Exit Lighting Fixture, w/ Battery
4
Each
Lavatory, Vitreous China
4
Each
Fluorescent Lighting Fixture, 160w
88
Each
Service Sink, Iron Enamel
1
Each
Metal Halide Lighting Fixture, Low Bay, 250w
8
Each
Sink, Stainless Steel
5
Each
Receptacle, 120V, 15 Amp
65
Each
Tankless Water Closet
4
Each
Wiring Device, Switch
32
Each
Circulator Pump, 1/12 HP, Hot Water
1
Each
Fire Alarm Bell, 6"
2
Each
Pipe & Fittings, 2" Copper, Cold Water
1
K Ln Ft
Fire Alarm Control Panel
1
Each
Pipe & Fittings, 3/4" Copper, Cold Water
1
K Ln Ft
Heat Detector
4
Each
Pipe & Fittings, 3/4" Copper, Hot Water
1
K Ln Ft
Manual Pull Station
3
Each
Pipe Insulation, Cold Water
2
K Ln Ft
2
Each
Pipe Insulation, Hot Water
0.6
K Ln Ft
Commercial Walk-In Freezer/Cooler
1
Each
Annual Sustainment Costs
.00
.00
.00
.00
.00
.00
1 3 5 7 9 11 13 15 17 19 21 23 25 27 29 31 33 35 37 39 41 43 45 47 49
50 Year Life Cycle