TRACES PBMW SYSTEM FOR WINDOWS
NAVFACENGCOM ANYDIV
ANYWHERE NAS
ASSEMBLY CATEGORY SUMMARY
CONSEPT DESIGN PHASE ESTIMATE
Report Started at Level: CHILD DEVELOPMENT CENTER I
ESTIMATOR: Paul Bryan McWilliam
SYSTEM/SUBSYSTEM/ASSEMBLY CATEGORY
QTY
UM
LABOR
MATERIAL
EQUIPMENT
TOTAL
Unit Cost
Unit Cost per
%
per WBS
Total Facility
UM
Scope
01 SUBSTRUCTURE
0101 STANDARD FOUNDATION
010101 WALL FOUNDATIONS
,231
,939
7
,417
010102 COLUMN FOUNDATIONS & PILE CAPS
9
||content||
,417
||content||
,769
TOTAL SUBSYSTEM 0101 STANDARD FOUNDATION
,560
,356
0
,186
1.20%
Subsystem Units [SF]: 9,520
||content||
.81
0103 SLAB ON GRADE
010301 STANDARD SLAB ON GRADE
,223
,573
||content||
,204
,999
TOTAL SUBSYSTEM 0103 SLAB ON GRADE
,223
,573
||content||
,204
,999
1.74%
Subsystem Units [SF]: 9,520
.63
TOTAL SYSTEM 01 SUBSYSTEM
9,520
,783
,929
||content||
,474
,185
2.94%
.44
02 SUPERSTRUCTURE
0202 ROOF CONSTRUCTION
,622
,655
,696
,973
020201 STRUCTURAL FRAME
,622
,655
,696
,973
3.48%
TOTAL SUBSYSTEM 0202 ROOF CONSTRUCTION
Subsystem Units [SF[:
TOTAL SUBSYSTEM 02 SUPERSTRUCTURE
,622
,655
,696
,973
3.48%
12/29/1995
Costs are inclusive of all markups (Contract Cost).
Page No.
1