TRACES PBMW SYSTEM FOR WINDOWS
NAVFACENGCOM ANYDIV
ANYWHERE NAS
ASSEMBLY CATEGORY SUMMARY
CONSEPT DESIGN PHASE ESTIMATE
Report Started at Level: CHILD DEVELOPMENT CENTER I
ESTIMATOR: Paul Bryan McWilliam
SYSTEM/SUBSYSTEM/ASSEMBLY CATEGORY
QTY
UM
LABOR
MATERIAL
EQUIPMENT
TOTAL
Unit Cost
Unit Cost per
%
per WBS
Total Facility
UM
Scope
0802 DOMESTIC WATER SUPPLY
080202 VALVES & HYDRANTS
5
7
080204 INSULATION & IDENTIFICATION
||content||
,779
,667
,499
080205 SPECIALTIES
||content||
TOTAL SUBSYSTEM 0802 DOMESTIC WATER SUPPLY
,934
,034
2
,430
1.84%
Subsystem Units [EA]:
0803 SANITARY WASTE & VENT SYSTEM
080301 WASTE PIPE & FITTINGS
,461
,457
2
,050
080302 VENT PIPE & FITTINGS
2
6
||content||
,069
080303 FLOOR DRAINS
6
6
TOTAL SUBSYSTEM 0803 SANITARY WASTE & VENT SYSTEM
,090
,369
6
,615
0.88%
Subsystem Units [EA]:
0805 PLUMING EQUIPMENT
080501 DOMESTIC WATER SUPPLY EQUIPMENT
,847
,935
TOTAL SUBSYSTEM 0805 PLUMING EQUIPMENT
,847
,935
0.34%
Subsystem Units [EA]:
TOTAL SYSTEM 08 PLUMBING
,553
,990
3
,296
4.34%
Subsystem Units [EA]:
41
||content||
,519.40
09 H.V.A.C.
0901 ENERGY SUPPLY
090102 GAS SUPPLY SYSTEM
4
||content||
,687
,096
TOTAL SUBSYSTEM 0901 ENERGY SUPPLY
4
||content||
,687
,096
0.15%
Subsystem Units [MBH]:
0902 HEAT GENERATING SYSTEM
12/29/1995
Costs are inclusive of all markups (Contract Cost).
Page No.
6