TRACES PBMW SYSTEM FOR WINDOWS
NAVFACENGCOM ANYDIV
ANYWHERE NAS
ASSEMBLY CATEGORY SUMMARY
CONSEPT DESIGN PHASE ESTIMATE
Report Started at Level: CHILD DEVELOPMENT CENTER I
ESTIMATOR: Paul Bryan McWilliam
SYSTEM/SUBSYSTEM/ASSEMBLY CATEGORY
QTY
UM
LABOR
MATERIAL
EQUIPMENT
TOTAL
Unit Cost
Unit Cost per
%
per WBS
Total Facility
UM
Scope
TOTAL SYSTEM 09 H.V.A.C.
,210
0,793
||content||
,754
8,756
13.58%
Subsystem Units [MBH]:
0
10 FIRE PROTECTION SYSTEMS
1001 WATER SUPPLY (FIRE PROTECTION)
100101 WATER SUPPLY EQUIPMENT & PIPING
||content||
,575
,394
1
,560
TOTAL SUBSYSTEM 1001 WATER SUPPLY (FIRE PROTECTION)
||content||
,575
,394
1
,560
1.15%
Subsystem Unite [EA]:
1002 SPRINKLERS
100201 SPRINKLER HEADS & RELEASE DEVICES
,915
,915
TOTAL SYSTEM 1002 SPRINKLERS
,915
,915
0.69%
Subsystem Unite [EA]:
1004 FIRE EXTINGUISHERS
100401 FIRE EXTINGUISHING DEVICES
1
9
TOTAL SUBSYSTEM 1004 FIRE EXTINGUISHERS
1
9
0.01%
Subsystem Units [EA]:
TOTAL SYSTEM 10 FIRE PROTECTION SYSTEMS
||content||
,622
4,559
3
,674
1.86%
11 ELECTRIC POWER & LIGHTING
1101 SERVICE AND DISTRIBUTION
||content||
,355
,316
,748
110102 SECONDARY
||content||
,201
,054
,285
0
,037
,893
110105 PANELS
,476
,490
,024
12/29/1995
Costs are inclusive of all markups (Contract Cost).
Page No.