FY 1998
CURRENT WORKING ESTIMATES FOR BUDGET PURPOSES
PG 2
DD1391 FORM:
12345
DATE PRINTED: 04/28/1998
PERM PROJNO:
12345
DATE REVISED: 04/28/1998
Fort Bragg, NC
Child Development Center
North Carolina
ACF = 0.86
TYPE OF CONSTRUCTION: NPM New Permanent
CONST
UNIT
TOTAL
CAT
DESCRIPTION
UOM
QUANTITY
COST
COST
CODE
Support Facility (Continued)
Water, Sewer, & Gas (Continued)
Steam And/Or Chilled Water Distr
LS
(30)
1 1/2" Dual Pipe Htw Distribution
LF
360.00
32.32
11.6
4" Chw Pipe
LF
180.00
62.85
11.3
24" Arch-Tile System
LF
70.00
95.19
6.7
Gate Valves
EA
2.00
363.53
0.7
Paving, Walks, Curbs, & Gutters
LS
(26)
1-1/2" Bit. w/6" Base
SY
52.00
38.49
2.0
Concrete Sidewalk
SF
6807.00
3.28
22.3
Curb & gutter
LF
60.00
24.17
1.5
Pavement Marking
EA
2.00
63.18
0.1
Signage
EA
2.00
38.82
0.1
Concrete Stairs
LS
0.1
LS
(20)
Catch Basin
EA
4.00
604.21
2.4
Grate Inlet
EA
4.00
1212.78
4.9
15" R.C. Pipe
LF
520.00
22.57
11.7
Storm manhole
EA
1.00
977.49
1.0
Curb Inlet
EA
1.00
348.58
0.3
Site Imp(45)/Demo(0)
LS
(45)
Remove Curb & Gutter
LF
33.00
3.94
0.1
Remove Volleyball Court
EA
1.00
508.35
0.5
Remove Dumpster Pad
EA
1.00
435.73
0.4
Remove Htw Pipe & Asb. Plan
LF
95.00
87.93
8.4
Unclassified Excavation
CY
1956.00
3.63
7.1
Strip and Spread Topsoil
CY
6.06
5.81
0.0
Landscaping-Tree/Shrubs
LS
4.6
Grassing
SY
5400.00
3.41
18.4
Stone Outlet Sediment Trap
EA
3.00
1140.86
3.4
EA
2.00
236.54
0.5
Erosion Control Netting
SY
200.00
9.28
1.9
Relocate 5 Willow Oak Tree
EA
1.00
5.81
0.0
Information Systems
LS
(21)
Telephone/Fiber Optics
LF
1760.00
11.76
20.7
Other
LS
(0)