TRACES PBMW SYSTEM FOR WINDOWS
NAVFACENGCOM ANYDIV
ANYWHERE NAS
ASSEMBLY CATEGORY SUMMARY
CONSEPT DESIGN PHASE ESTIMATE
Report Started at Level: CHILD DEVELOPMENT CENTER I
ESTIMATOR: Paul Bryan McWilliam
SYSTEM/SUBSYSTEM/ASSEMBLY CATEGORY
QTY
UM
LABOR
MATERIAL
EQUIPMENT
TOTAL
Unit Cost
Unit Cost per
%
per WBS
Total Facility
UM
Scope
200401 TELEPHONE SYSTEMS
7
,987
,905
7
,987
,905
0.62%
ALARM SYSTEM
Subsystem Units [LF]:
2006 CATHODIC PROTECTION
200601 SACRIFICIAL ANODE SYSTEM
||content||
,066
||content||
,661
4
,030
TOTAL SUBSYSTEM 2006 CATHODIC PROTECTION
||content||
,066
||content||
,661
4
,030
0.21%
Subsystem Units [LF]:
TOTAL SYSTEM 20 SITE ELECTRICAL UTILITIES
,592
,490
||content||
,724
,806
4.45%
TOTAL ESTIMATED FACILITY COST
8,943
||content||
,027,780
,566
||content||
,435,289
100.00%
12/29/1995
Costs are inclusive of all markups (Contract Cost).
Page No.
14