FY 1998
CURRENT WORKING ESTIMATES FOR BUDGET PURPOSES
PG 1
DD1391 FORM:
12345
DATE PRINTED: 04/28/1998
PERM PROJNO:
12345
DATE REVISED: 04/28/1998
Fort Bragg, NC
Child Development Center
North Carolina
ACF = 0.86
TYPE OF CONSTRUCTION: NPM New Permanent
BASIS OF ESTIMATE:
NAME AND ADDRESS OF AE:
Parametric
Design "R" Us
STATUS OF DESIGN:
Anywhere, U.S.A.
CONCEPT
42.86%
FINAL 15.00%
Anywhere, U.S.A.
PREP BY: Cost Engineering
APP BY:
OFF: CEMP-EE
PH: (202)761-1241
OFF:
PH:
CONST
UNIT
TOTAL
CAT
DESCRIPTION
UOM
QUANTITY
COST
COST
CODE
Primary Facilities
1088
74014 Child Development Center
SF
9520.00
106.40
(1013)
Substructure
SF
9520.00
5.81
55.3
Superstructure
SF
9520.00
12.77
121.6
Exterior Closure
SF
9520.00
12.48
118.8
Roofing
SF
9520.00
4.00
38.1
Interior Construction
SF
9520.00
9.98
95.0
SF
9520.00
10.09
96.1
Conveying Systems
SF
9520.00
0.00
0.0
Plumbing
SF
9520.00
12.12
115.4
HVAC
SF
9520.00
17.61
167.6
Fire protection systems
SF
9520.00
0.37
3.5
Electric Power & Lighting
SF
9520.00
12.69
120.8
Electrical Systems*
SF
9520.00
2.52
24.0
Equipment
SF
9520.00
0.00
0.0
Furnishings
SF
9520.00
5.96
56.7
Special Construction
SF
9520.00
0.00
0.0
80800 Building Information Systems
LS
(75)
Support Facility
275
Electric Service
LS
(106)
Aerial Primary System
LS
2.0
U.G. Primary
LS
81.6
LS
22.5
Water, Sewer, & Gas
LS
(26)
6"ater Line
LF
95.00
52.06
4.9
3" Water Line
LF
100.00
27.26
2.7
3" Gate Valve
EA
1.00
685.93
0.7
6" Gate Valve
EA
1.00
1216.05
1.2
6" P.I. Line
EA
1.00
1372.04
1.4
4" Sanitary Line
LF
1090.00
11.36
12.4
4" Tie-In To Exist Sanitary
EA
1.00
181.55
0.2
Manhole
EA
1.00
2143.80
2.1
ENG FORM 3086
Enclosure 7