UFC 4-171-05
1 January 2005
with change 25 October 2006
provide a 28-volt DC power plug strip above the workbench for testing equipment after
repairs. Provide static-dissipative VCT flooring.
Figure 4-43
Figure 4-42
Break Area
Electric / Comm. Repair
4-5.6
Breakroom
4-5.6.1 This is a multipurpose space for employee relaxation and meals, and to
conduct classroom training activities. It should be located adjacent to the toilets and
locker rooms, and should include a drinking fountain.
4-5.6.2
||content||
\ Space Design Information: Same as training center break area, Section
4-2.43 above except use plastic shell seat and back sled-base stacking chairs without
upholstery./1/
4-5.7
Male and Female Locker Rooms
4-5.7.1 These spaces will be used by the full-time, civilian maintenance technicians to
store street clothing and to change. They should be located with the breakroom and
toilets.
4-5.7.2 One locker will be provided for each authorized AMSA position. Designer
should consider providing a few extra lockers for each sex to anticipate staff turnover.
The lockers should be heavy-duty steel athletic-type, 15 in wide by 18 in deep by 72 in
tall (380 mm wide by 460 mm deep by 1830 mm tall).
4-5.7.3
Space Design Information: Same as training center lockers, Section 4-2.41
above.
4-5.8
Male and Female Toilets and Showers
4-5.8.1 Toilets and showers are provided for the use and convenience of the
personnel, and should be located with the breakroom and lockers.
4-5.8.2
Space Design Information: Same as training center toilets and showers,
145