Project Name
Project No. ___________
UFC 4-214-02, TEMF, 24 July 03
Maintenance Access Considerations
Noise Considerations
Quality of Materials Proposed
Special Ventilation Systems
Ventilation Air for Occupant Comfort
Durability of Proposed Equipment/Systems
c.
Building Construction Materials (Other than Structural, HVAC, Electrical).
This subfactor
evaluates the quality of the materials proposed for installation in the facility. The facilities constructed
under this solicitation will represent significant Army assets and as such are expected to have a long
effective life span. Proposal materials will be evaluated on the basis of ease of maintenance, longevity of
finishes and construction materials and other durability considerations. Offerors are encouraged to
highlight the innovative and specific means proposed to address these considerations.
d. Facility Equipment and Built-Ins. This subfactor evaluates the built-in equipment and other facility
equipment proposed for installation. Consideration will be given to operating and maintenance
requirements, durability, and serviceability of the proposed equipment. The materials proposed must be
suited for heavy long term usage. These systems include lifts, cranes, work tables, storage lockers,
maintenance pits, compressed air systems, and other equipment included with the facility which directly
supports the mission of the facility.
e. Integration of Interior Support Systems (HVAC, Electrical, Structural, Plumbing, etc).
This
subfactor evaluates the integration of the various supporting systems among themselves and within the
proposed structural systems. Offeror's proposal shall include a narrative which illustrates the methods
and processes whereby the various supporting systems are coordinated to assure a minimum of
construction problems which relate the interface between the disciplines. Particular attention should be
given to the overhead cranes, specialized exhaust systems, and operational support equipment.
f. Force Protection Considerations. This subfactor evaluates the implementation and considerations
of the facility construction related Force Protection Requirements associated with these facilities. A
proposal rated "Unacceptable" in this subfactor will be eliminated from consideration.
g.
Fire Protection and Fire Alarm Systems. This subfactor evaluates the proposed fire protection
and fire alarm system, including the connection of the proposed fire alarm system to the existing base-
wide fire reporting system which is monitored by the fire department. Included in this subfactor is the
design as well as the materials proposed for installation. Fire protection and fire alarm systems are key
systems and must be adequately addressed in the proposal.
h. Building Thermal Performance. This subfactor evaluates the overall thermal performance of the
building structure and includes walls, windows, doors, infiltration, perimeter insulation, and any heat
transferring surface within the new constructions. The Statement of Work provides a minimum level of
prescriptive requirements which must be included in the proposal.
Offerors will receive additional
consideration for thermal performance which exceeds the minimum requirements and which reduce the
overall energy usage of the facilities.
i.
This subfactor evaluates the provision of
communications and telephone systems in the facilities as well as the materials proposed for installation.
j.
Intrusion Detection and Security Systems.
This subfactor evaluates the proposed security
systems including design and materials.
k. Plumbing Systems. This subfactor evaluates the provision of plumbing systems in the facilities as
well as the materials proposed for installation.
l.
Cable Television Systems. This subfactor evaluates the provision of cable television systems in
the facilities as well as the materials proposed for installation.