11.1.2.2 Site Grading and Drainage Plans: Show locations of all sediment basins, diversion ditches,
and other erosion control structures. Indicate the approximate drainage areas each will service.
Indicate the materials, construction and capacity of each structure. Include limits of landscaping and
seeded areas. General site grading and drainage shall be indicated by contour lines with an interval
of not more than approximately 1 m.
11.1.2.3 Road Alignment Plans: Scale shall be no greater than as indicated in SECTION 00110A:
PHASE 2 TECHNICAL SUBMISSION REQUIREMENTS AND INSTRUCTIONS and profiles showing
pavement and shoulder widths, azimuths and curve data, limits of grading, and erosion control. The
materials to be used shall be indicated.
11.1.2.4 Traffic Control Plan: Traffic routing and signage shall be in accordance with The Manual on
Uniform Traffic Control Devices for Streets and Highways, U.S. Department of Transportation, Federal
Highways Administration.
11.1.2.5 Sanitary Sewer Plan: Scale shall be as indicated in SECTION 00110A: PHASE 2
TECHNICAL SUBMISSION REQUIREMENTS AND INSTRUCTIONS and profiles showing location
and elevation of pipe, thrust blocks, manholes, etc. Materials and construction of main and
appurtenances shall be indicated. Specifications shall be provided.
11.1.2.6 Water Supply Line Plans: Scale shall be as indicated in SECTION 00110A: PHASE 2
TECHNICAL SUBMISSION REQUIREMENTS AND INSTRUCTIONS and profiles showing locations
of valves, thrust blocks, connections, etc. Materials shall be indicated and specifications shall be
provided for valves, pipes, etc.
11.1.2.7 Electrical Plan Requirements:
11.1.2.7.1 Required diagrams and details on Site Electrical Drawings.
11.1.2.7.1.a.
Off-Site Electrical Distribution Plan:
11.1.2.7.1.b.
Off-Site Primary Circuit Routing Plans:
11.1.2.7.1.c.
Off-Site One Line Diagram. (If applicable)
11.1.2.7.1.d.
Off-Site Details. (Aerial Pole Line Construction, etc.) (If applicable).
11.1.2.7.1.e.
On-Site Electrical Distribution Plan:
11.1.2.7.1.f.
On-Site One Line Diagram.
11.1.2.7.1.g.
On-Site Distribution Transformer Schedule: Provide with the following headings:
Transformer Designation. Transformer Size (KVA). Building(s) Served.
Primary Phase(s) and Circuit to which connected.
11.1.2.7.1.h. On-Site Details (Site Lighting, Trenching, Pad-Mounted Transformer, etc.).
11.1.2.8 Specifications: Provide final draft specifications which include all sections which apply to
site/utility work.
11.1.2.9 Design Analysis: Design analysis shall include design calculations fully developed to support
the design of the site and utility systems included in this submittal.
11.1.2.10 Geotechnical Report: Geotechnical information must be provided to support all
assumptions and design parameters utilized in the presented site/utility design as applicable.
11.2
The Preliminary Conformance - 50% Building Submittal shall contain, as a minimum, the
following:
11.2.1 Not Used.
11.2.2 Not Used.