UM = EA
Construction Cost Factor (CCF)
,313.05/EA, based on data provided by the manufacturer of ship buoys, inflated to FY04 $
using the appropriate OSD published factors.
Sustainment Cost Factor (SCF)
.93/EA, the sustainment factor was calculated using a ratio from FAC 1351 (0.17%) as no
other auditable data was available.
NO LAYOUT AVAILABLE